MOSHASSUCK VALLEY INTERCEPTOR

PROJECT OVERVIEW

As Rhode Island’s largest public sewer system and sewer treatment facilities owner, the Narragansett Bay Commission (NBC) maintains and operates a 24″ interceptor carrying wastewater from the cities of Pawtucket and Central Falls to its Providence Wastewater Treatment Facility. Certain sections of the line, located in the city of Central Falls, were constructed over a closed landfill. The section is approximately 3,000 feet long and has been a maintenance problem for NBC for decades. The line suffered from constant settlement and infiltration issues. As the original contract work neared completion NBC also decided to replace two nearby deteriorated 48″ Combined Sewer Overflow (CSO) culverts which ran beneath a football field and running track used by Central Falls High School.

Project Title: MOSHASSUCK VALLEY INTERCEPTOR

Location: Central Falls, RI


CLIENT

Narragansett Bay Commision (NBC)

COST

$11,760,239.28

Construction vehicles, including a bulldozer and excavator, working on-site.

EMBRACE OPPORTUNITY

LAY THE FOUNDATION FOR YOUR FUTURE – APPLY NOW

LET’S BUILD
TOGETHER

NEED TO REACH US?

LET’S TALK